Installation: thinset method Back [ 18 of 18 ] Next  
Curing the groutGrout should be damp cured for at least seven days before the tiles are subjected to physical impact – in the case of glass floor tile, this includes construction traffic of any kind. If the installation is a submerged or heavy water-use application, such as spas and swimming pools, the grout should cure 21 days before use.For more information, consult our Installation/Technical page. Information on these pages is offered as a background and guideline. No warranty is implied. Always consult manufacturer instructions.
   Technical & Installation Main Page